The European powerful online platform with manufacturers and suppliers of pressure equipments​

pressure equipments plant

Is Design Approval by a notified body required under Modul G?

Module G does require that a notified body must examine the design of the pressure equipment and it is considered reasonable to expect the notified body to inform the manufacturer of the results of the examination.

Module G does not contain any explicit requirement for approval of the design by the notified body.

However, it is understood that design approval is common practice for the types of pressure equipment to which module G would be applied.

Approval Manufacturer’s Design Calculation by Notified Body

The results of the design calculations are part of the technical documentation and the manufacturer must submit these to the notified body involved at the latest during the final inspection.

After a successful final inspection, the notified body issues a ‘Certificate of Conformity’, which also certifies the design approval.

Read More

Module G: Conformity assessment

Which documents have to be available for the final inspection of a Pressure Equipment?

DIRECTORY

for
Manufacturers & Suppliers
Features:
  • Link directly to your Website
  • Company type
  • Location
  • Brief description of your company
  • Products limits dia., length & weight
  • Main used mat'l groups ISO/TR 15608
  • Directory is supported by professional Engineers
For free

Simple registration in 3 steps:

  1. Registration only with name, e-mail, company name,
  2. Approval and sending login data by PED directory team
  3. The vendor sends the prepared form with the details for the vendor directory listing

FAQs 
for Manufacturer/Suppliers

Yes, entries for any product categories are free.

No, the period can be agreed for a fixed term without a subscription.

After finding your interested manufacturer, you can contact him by clicking the Link on LOGO or Company Name