The European powerful online platform with manufacturers and suppliers of pressure equipments​

pressure equipments plant

Guideline I-20

Question

Answer

No.

When

  • the boiler is intended for operation without continuous supervision
  • the specific hazards due to this situation are taken into account in the hazard analysis and design of the assembly and its safety systems
  • this assembly meets all relevant provisions of the PED (including a description of the intended operation mode and of the associated safety systems in the instructions for use)

any additional design requirements would constitute a restriction on or impediment to the making available on the market of this product placing of this product on the market.

National requirements may oblige the user to check the function of the safety system periodically. The requirements shall be based on technical criteria of the design of the safety system in order to guarantee that for similar safety systems the same operational requirements apply.

See also PED Guidelines C-04, H-03 and I-18.

Note:
PED Guideline H-15 identifies significant ESRs applicable to boilers intended for operation without continuous supervision.