The European powerful online platform with manufacturers and suppliers of pressure equipments​

pressure equipments plant

Guideline D-15

Yes, Provided that the final assessment has been performed under the QA system certified (and surveyed) by Notified Body “X” before the expiry date of the system certificate. The manufacturer must keep records of which notified body approval his equipment was manufactured under. One solution is to include a date on the declaration of conformity.

Guideline D-17

Yes, all pressure equipment assessed in accordance with module B (production type) + C2 shall be marked with notified body’s identification number indicating the involvement of the Notified body in the production control phase.