Guideline H-02
In accordance with Annex I Section 3.2.2 in the course of the final assessment pressure equipment must be subjected to a test for the pressure containment aspect. As a rule, this test for the pressure containment aspect is supposed to be carried out in the form of a hydrostatic pressure test. Where this is not […]
Guideline F-16
No, unless the joining of this temporary component, for example by welding, is likely to affect the safety of the equipment during its future operation. However, the manufacturer is responsible for the application of these components, which must have an adequate level of safety and meet the national labour regulation. Examples of temporary components: temporary […]
Guideline F-17
Yes. Note:The manufacturer should ensure that the replacement components are equivalent to those specified in the technical documentation.
Guideline D-13
No. In modules F and G, means and resources for carrying out the final inspection and/or proof test can be provided by the manufacturer to the Notified Body inspector, but the Notified Body shall be present during the final inspection and proof test.
Guideline C-06
Using the global conformity assessment of Article 14 paragraph 6, each item of pressure equipment and the integration of the items of pressure equipment (Annex I, section 2.8) should be assessed. Annex I, first preliminary observation determines that the requirements of Annex I also apply to assemblies, if corresponding hazard exists. Each item of pressure […]